The Next Frontier for Building Energy Management: Automated Continuous Commissioning
Friday, June 12th, 2009 | Energy Saving Tips, Green Buildings & Green Technology, HVAC Maintenance and Efficiency
We’ve talked with you before about building commissioning. In May we even devoted a whole post to the topic of retro-commissioning as a means of achieving greater energy efficiency.
But the story isn’t complete without a reference to the other type of commissioning that’s gaining in popularity — as much in concept as in practice, we think — which, along with retro-commissioning, seems to represent the fabled Wave of the Future.
We’re talking about Continuous Commissioning, also known as Automated Continuous Commissioning, or ACC (and yes, it’s a proper noun, because Texas A&M Energy Systems lab has trademarked the term).
DEFINING ACC
First, a definition, from the Federal Energy Management Program’s (FEMP) Continuous Commissioning Guidebook for Federal Energy Managers:
Continuous Commissioning is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. [It] focuses on improving overall system control and operations for the building, as it is currently utilized, and on meeting existing facility needs. It goes beyond an operations and maintenance program. It does not ensure that the systems function as originally designed, but ensures that the building and systems operate optimally to meet the current requirements.
Is that clear? We think this other quote from the same federal guidebook makes it even clearer:
While most commissioning processes focus on bringing building operation to the original design intent, Continuous Commissioning is different. Continuous Commissioning focuses on optimizing HVAC system operation and control for the existing building conditions. This is an important distinction.
These excerpts make the point glaringly obvious, but we’ll make it still more so: Continuous Commissioning takes advantage of cutting-edge building monitoring and control technologies to glean mountains of real-time data from building systems and then adjust their operation accordingly, in an ongoing feedback loop. We think there’s a good analogy to be made to the advent of real-time magnetic resonance imaging (MRI) technology in the medical field. This technology has revolutionized modern medicine by offering a real-time look into — as opposed to a static snapshot of — the human body’s inner workings. Medical treatments are being modified and sharpened accordingly.
In a similar way, the real-time feedback and system modification capabilities that are offered by Building Automation Systems allow commissioning to be performed not as a one-time process that’s completed when a building is first constructed, nor as a static, snapshot-like modification that’s completed every few years as in retro-commissioning, but as an ongoing process in which systems are adjusted based on actual, present, day-to-day, minute-by-minute conditions.
DISCUSSING ACC
David Wolins, chief executive officer of energy consulting firm Scientific Conservation, does a really able job of explaining the matter in plain terms that makes it import readily apparent:
The biggest challenge facing [companies in the multi-billion dollar commercial building market is] something called “energy drift” — the constant, imperceptible loss of energy from commercial buildings that ends up costing billions of dollars and generating tons of toxic waste every year.
. . . . It might seem that so many structures are being built “green” these days that the issue of energy leakage has been solved. Wrong. The moment a building is commissioned for “optimal performance,” it is already fading from green to gray. Building designers and tenants immediately start tweaking thermostats and changing settings so that systems start sliding in efficiency yet again (”Making sure green buildings don’t fade to gray,” VentureBeat, May 4, 2009).
He also describes Automated Continuous Commissioning, or ACC, in excellent everyday-speak, and indicates its revolutionary significance:
Instead of configuring a building for optimal performance just once with occasional “tune-ups,” ACC performs 24-7 monitoring and analysis of a building’s energy consuming ecosystem. . . . By continuously collecting internal data about what’s going on inside a building, plus external data on things like the weather changes and utility pricing, limitations on operations’ forecasting are beginning to lift. And with ACC solutions making their way to market, energy efficiency is evolving from buzzword to benchmark.
This is definitely a topic to keep on your radar.
Want to be alerted of new blog posts and other Goodway communications? Click here to subscribe.
Written by: Goodway Blogging Team
1 Comment to The Next Frontier for Building Energy Management: Automated Continuous Commissioning
In many buildings it will also make sense to use one of the centralized shared-sensor monitoring systems to accurately obtain continuous feedback on ventilation and moisture management performance, to make sure that a healthy indoor environment is being provided to both occupants and visitors.
Leave a comment
Subscribe via E-mail
Categories
- Building Energy Performance
- Building Energy Quotient (Building EQ)
- Building Maintenance Industry News
- Building Management Systems (BMS)
- Clean Energy Economy
- Energy Independence and Security Act of 2007
- Energy Saving Legislation
- Energy Saving Tips
- Green Building Codes
- Green Buildings & Green Technology
- HVAC Complaints
- HVAC Deferred Maintenance
- HVAC Industry
- HVAC Jobs / Career Advice
- HVAC Maintenance and Efficiency
- HVAC Regulations and Standards
- HVAC Video Blog
- HVLS Fan
- Industrial Cleaning Equipment
- innovative HVAC Solutions
- LEED
- Leed Certification
- Sick Building Syndrome
- Strategic Facility Planning (SFP)
Archive
Recent Posts
- Proper Filter Maintenance Cuts Coil Cleaning Costs
- New Laws Create New Challenges – LEED V3, ASHRAE 189.1 and CalGreen
- Deferred Chiller Maintenance Comes With Hidden Costs
- California Passes Nation’s Strictest Green Building Code
- New ASHRAE Program Grades Building Energy Performance
- ASHRAE President Sees A Busy Year Ahead For The Industry, Part 2
Recent Comments
- Tom Moore: This is good that we are making a move to reduce waste, it is only a matter of time until the rest of the...
- kinary: other than the suggestions u mentioned above, i also recommend dsl speed which can boost ur internet...
- Bud Campbell: Interesting article. I am going to have to look into these cooling tower vacuums.
- Air Zero: Thank you – going green is getting to be over kill.
- Dan Winters: Excellent points, particularly about the liability/risk issues – having a strong system of record...
Links
- ACCA (Air Conditioning Contractors of America)
- ACEEE (American Council for an Energy Efficient Economy)
- Arden Engineering Constructors
- ASHRAE (American Society of Heating, Refrigerating, and Air-Conditioning Engineers)
- Buildings.com
- ENR (Engineering News Record)
- Environmental Building News
- Facilities Net
- FMLink (facilities management news)
- Goodway Technologies
- HVAC Talk
- Read Generation
- SchoolFacilities.com
- Scout Blogging Services
- The News (air-conditioning, heating, refrigeration news)
- Today’s Facility Manager
- U.S. Green Building Council
- User Login







July 4, 2009